
Industrial Expertiseat the service of your freedom
From the homologation of your VASP Motorhome to industrial electronic maintenance. Benefit from 20 years of technical experience and a UTAC qualification.

Homologation & Compliance
Your VASP Vehicle Registration Stress-Free
From technical to administrative, Morel Consulting supports you through every step of homologating your dream.
Qualigaz Serenity Pack
Technical support, Qualigaz visit fee INCLUDED
Technical certification before the approved body's visit to guarantee validation without a follow-up inspection.
- Compliance Audit: Rigorous verification according to NF EN 1949 and EN 721 standards.
- Professional Leak Test: Performing the 150 mbar pressure test with engineering equipment.
- Regulatory Security: Provision of the 3 approved Morel Consulting signage plates.
- Organization of the official Qualigaz visit included.
DREAL Application (RTI)
Administrative & Technical Support
We guide you through the administrative maze to obtain your RTI (Individual Vehicle Approval).
- Help with filling out the RTI application (Forms, load calculations).
- Component Selection: Advice on meeting standards (glazing, seats, etc.).
- Provision of approved safety labels.
- Laser-engraved aluminum tare plate & Weighing ticket.
Examples of provided signage

VASP Signage

Gas Instructions

Safety Instructions

Qualigaz Partner
* The images above are protected and cannot be copied. They are provided physically during the service.
Uncompromising Expertise
Why are 90% of individual applications rejected?
VASP homologation has become a science of precision. Since the new 2023 directives, the DREAL leaves no room for interpretation.
The Gas Trap (EN 1949)
A sealed box is not enough. The type of fittings, the frequency of attachment points, and the exact nature of the copper are scrutinized. We perform a 150 mbar pressure audit with a certificate to guarantee your approval.
Load Distribution
This is the centerpiece of the RTI application. A complex calculation including the weight of occupants, full tanks, and the remaining payload. An error on one axle and your certificate of conformity is void.
VHL Safety Standards
Furniture angles, resistance of fixings to simulated crash tests, compliance of 43R glazing and 10R equipment... We check the 50 critical control points before the final examination.
"Unlike digital platforms, we are professionals of the trade, certified for over a decade with UTAC as a qualified operator & ISO9001. We know the technical reality of bodywork, which allows us to validate solutions that others would reject simply due to a lack of knowledge of the standards."
Qualigaz Inspection
Success Rate: 100%
When accompanied by us from the pre-visit.
Administrative Checklist
DREAL RTI Application: The 13 Key Documents
A poorly prepared application is the primary cause of refusal. We assist you in collecting, compiling, and validating each document.
Application for Approval
Official RTI application form.
Vehicle Registration
Copy of the current vehicle registration document.
Type Approval (Barré Rouge)
Manufacturer's descriptive sheet for the base vehicle.
Dimensioned Plan
Detailed plan of the layout with precise dimensions.
Load Distribution
NF EN 1646-2 compliance calculations.
Transformation Certificate
Document certifying the work carried out.
Manufacturer's Authorization
Required for structural modifications.
Weighing Slips
Tickets from a certified scale (Axles + Total).
Heating Compliance
Proof of installation compliant with directive 2001/56.
Gas/Vasp Certificate
Qualigaz or Veritas certificate (EN 1949).
Seat Compliance
If adding or modifying seating positions.
Technical Inspection Certificate
Currently valid.
Transformation Plate
Engraved plate (characters > 4mm) affixed to the vehicle.
Focus: The Transformation Plate
Mandatory for the RTI, it must be permanently affixed (engraved) with characters of at least 4mm. We provide a LASER-engraved aluminum plate in our DREAL package.
Template Example
TRANSFORMER: MOREL CONSULTING
VIN: VF3**********************
GVWR: ****** kg GCWR: ****** kg
GAWR Axle 1: **** Axle 2: ****

Budget & Timeline
A controlled project, without surprises
The Typical Journey
Preparation
Project StartPlanning according to AFNOR standards and selection of approved equipment (10R / 43R).
Conversion
2-4 monthsExecution of the work. RTI application prepared in parallel.
Gas Inspection
Week 12Qualigaz/Veritas visit (mandatory even without gas for ventilation).
DREAL Submission
Week 14Sending the complete RTI file. Processing time: 2 to 8 weeks.
Vehicle Registration
FinalObtaining the certificate of conformity and updating the registration document.
Direct Cost Estimation
Average total budget excluding conversion:
€450 - €900
Our €590 Qualigaz package optimizes this budget by including advice & pre-visit.
Our Previous Projects
They Trusted Us
Some examples of conversions supported by Morel Consulting for VASP homologation.








Frequently Asked Questions
We answer your questions
Industrial Continuity
LCE32: The Benchmark Automate
Following the closure of the manufacturer Concepts et Collectivités, Morel Consulting has developed the LCE32 card to ensure the maintenance and longevity of your fleet of garbage collection vehicles (GCV).
LCE32 Automate Card
The new standard for Garbage Collection Vehicles (GCV/RCV). Universal replacement for the entire NimXX family. Increased resistance to electromagnetic disturbances.
- 16 Digital Inputs / 16 Digital Outputs
- Outputs 15A max (40A Total)
- 8-bit 20Mhz Microcontroller
- 10/18V Compatible

Nim32s2 Card
Proven automate card. End-of-life, replaced by the LCE32. A few units still in stock for specific maintenance.
- Classic architecture
- 1.6mm Double-layer PCB
- SMD Components
LCE3 / Nim32 Card
Older generation. These cards are no longer sold.
Replaced by LCE32 (Compatible)
Specific programming included
For any purchase of an LCE32 card, we offer specific programming (Low & High level) according to your carrier vehicle. Please provide us with the VIN and the bodywork number of your vehicle.
Contact our technical support to validate compatibility →Our History & Expertise
Morel Consulting: Engineering for the real world
Founded by Nicolas Morel, a mechanical design engineer, our structure is built on unique field experience.
Strong industrial origins

With 20 years of experience heading the R&D department at "Concepts et Collectivités", Nicolas Morel has led the design of numerous innovative industrial vehicles.
Among our historical technical references in design and manufacturing:
- Transport vehicles for the Vélib' in Paris.
- Micro garbage collection vehicles (GCV) with on-board weighing.
- Heavy-duty garbage trucks.
- Food trucks on three-wheelers.
- Urban cleaning intervention vehicles (sandblasting, HP).
- Base camp trucks for construction sites or expeditions.
- Etc...
Multidisciplinary Skills
"We are not just administrative consultants. We are bodywork specialists, engineers, enthusiasts who speak your technical language."
Contact Us
Let's talk about your project
Our Contact Information
A question about homologation? Need a quote for a GCV controller card? Do not hesitate to call us.
Head Office
Morel Consulting
78410 Flins-sur-Seine
SIRET : 949 948 137 00011